Time & Work, with Pipes & Cisterns, has given about 1.4 questions per shift across 2021-2025, with a spike of about three per shift in 2023 and 0.96 per shift in 2025. The LCM method, workers leaving midway, efficiency, men-women equivalence, man-days, alternate days, wages and pipes with leaks dominate, and pipes formed the bulk of 2024.
| Year | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 (expected) |
|---|---|---|---|---|---|---|
| Questions per paper | 0.95 | 1 | 3.12 | 1 | 0.96 | 1 |
Efficiency, one person leaves after n days; occasional pipes
Time & Work in brief
- Work equals rate multiplied by time, so for a fixed job the faster worker simply needs less time.
- If someone finishes a job in a days, he completes 1/a of it every day, and that daily share is his rate.
- Rates can be added but times never can, so 12 days and 18 days together make 7.2 days, not 30.
- The smartest move is to call the whole job the LCM of the given times, which turns every rate into a whole number of units per day.
- With pair times such as A + B, B + C and C + A, adding the three pair rates counts every worker twice.
- Efficiency and time are opposites, so a worker who is 60% more efficient needs 100/160 of the time.
- When a person leaves or joins midway, list who worked on which days and make the units add up to the whole job.
- A worker who leaves k days before completion works for T - k days, where T is the total time.
- Men, women and boys become one currency once you find how many of one equal one of another.
- The chain rule says men times days times hours divided by work stays the same for the same kind of job.
- In alternate-day questions, fit as many full cycles as you can and then finish the leftover work day by day in the right order.
- Wages are shared in the ratio of the work done, which is rate multiplied by the days worked.
- A pipe that fills is a worker, and a leak or drain is a worker who undoes the job, so give it negative units.
- A tank that fills in a hours but takes t hours with a leak means the leak alone would empty it in at/(t - a) hours.
- Always check that working together is faster than the fastest single worker, and that the answer is in the unit asked.
Memory aids
- L -> take the LCM of the times as the total work
- U -> turn each time into Units per day
- C -> Combine the units of everyone working
- K -> Keep dividing: total units ÷ combined units = time
- M -> men
- D -> days
- H -> hours per day
- W -> work
Numbers to remember
| Number | What it is |
|---|---|
| 7.2 | Days for workers taking 12 and 18 days together |
| ab/(a + b) | Time for two workers together |
| 100/(100 + x) | Time factor when efficiency rises by x% |
| 5/8 | Time factor for 60% more efficiency |
| at/(t - a) | Time for a leak alone to empty a tank |
| ab/(b - a) | Fill time with an inlet (a) and an outlet (b) |
| 2xyz/(xy + yz + zx) | Time for three workers from their pair times |
| 3 | Approximate questions per shift during the 2023 spike |
Key formulas and rules
- Work = Rate × Time; Rate = 1/Time for one full job
- This is the foundation of the chapter.
- Total work = LCM of individual times; rate = LCM ÷ time
- This is the default method, counted in units per day.
- Two together = ab/(a + b)
- A takes a days and B takes b days.
- Three together = abc/(ab + bc + ca)
- Use it for three workers.
- B alone = aT/(a - T)
- A alone takes a days and both together take T days.
- A + B + C together = 2xyz/(xy + yz + zx)
- The pair times are x (A + B), y (B + C) and z (C + A).
- A alone = 2xyz/(xy + yz - zx)
- With x = A + B, y = B + C and z = C + A times; in units, A's rate = half the sum of the pair rates minus the (B + C) rate.
- C alone = 1 ÷ (1/T - 1/a - 1/b)
- A and B alone take a and b, and all three together take T.
Common traps
- Adding times instead of rates is wrong: 12 days and 18 days do not make 30 days together.
- When a worker leaves, remember that his working days were also days on which the other worker was working.
- Reading 60% more efficient as 60% less time (16 × 0.4) is wrong; the correct time is 16 × 100/160.
Solved previous-year questions
Q. Richa, Rita and Reena can independently complete a work in 8, 12 and 24 hours. Working together, how long will they take? (CGL 2023)
Answer: 4 hours
Step 1: Take the total work as 24 units. Step 2: Their rates are 3, 2 and 1 units per hour, which is 6 per hour together. Step 3: Time = 24 ÷ 6 = 4 hours.
Q. P and Q can complete a project in 15 and 10 days. They work together, but after 2 days Q leaves and P finishes. In how many days was the whole work completed? (CGL 2022)
Answer: 12 days
Step 1: Take the total as 30 units, so P does 2 and Q does 3 units per day. Step 2: In 2 days together they do 10 units. Step 3: P finishes the remaining 20 units in 10 days. Step 4: The total time is 2 + 10 = 12 days.
Q. A works 3.5 times as fast as B and takes 45 days less than B to complete a job. Find the days taken by A and B together. (CGL 2023)
Answer: 14 days
Step 1: If A takes a days, B takes 3.5a days. Step 2: 3.5a - a = 2.5a = 45, so a = 18 and B takes 63 days. Step 3: Together = 18 × 63 ÷ 81 = 14 days.
What the full notes cover
The complete Time & Work notes in the app have 15 chapters:
- From the basics
- Basic relations: rate, time and work
- The total-work (LCM) method: your default tool
- Working together, and finding one person's time
- Efficiency comparisons
- Someone leaves, joins or is replaced midway
- Men, women and boys: one currency
- The chain rule: man-days and man-hours
- Alternate-day and periodic work (cycle method)
- Work and wages
- Pipes and cisterns
- Work as a percentage or fraction
- Solved past questions
- How SSC asks it
- At Tier 2 level