CGL CompassSSC CGL Preparation PlannerSign in5 days free
Quantitative Aptitude

Time & Work for SSC CGL: notes summary

Work equals rate multiplied by time, so for a fixed job the faster worker simply needs less time.

Per paper, 20250.96Quantitative Aptitude
Expected in 20261Questions per paper
Chapters15In the full notes

Time & Work, with Pipes & Cisterns, has given about 1.4 questions per shift across 2021-2025, with a spike of about three per shift in 2023 and 0.96 per shift in 2025. The LCM method, workers leaving midway, efficiency, men-women equivalence, man-days, alternate days, wages and pipes with leaks dominate, and pipes formed the bulk of 2024.

How often SSC CGL asked Time & Work, 2021 to 2025.
Year202120222023202420252026 (expected)
Questions per paper0.9513.1210.961
How SSC asks it now

Efficiency, one person leaves after n days; occasional pipes

Time & Work in brief

Remember
  1. Work equals rate multiplied by time, so for a fixed job the faster worker simply needs less time.
  2. If someone finishes a job in a days, he completes 1/a of it every day, and that daily share is his rate.
  3. Rates can be added but times never can, so 12 days and 18 days together make 7.2 days, not 30.
  4. The smartest move is to call the whole job the LCM of the given times, which turns every rate into a whole number of units per day.
  5. With pair times such as A + B, B + C and C + A, adding the three pair rates counts every worker twice.
  6. Efficiency and time are opposites, so a worker who is 60% more efficient needs 100/160 of the time.
  7. When a person leaves or joins midway, list who worked on which days and make the units add up to the whole job.
  8. A worker who leaves k days before completion works for T - k days, where T is the total time.
  9. Men, women and boys become one currency once you find how many of one equal one of another.
  10. The chain rule says men times days times hours divided by work stays the same for the same kind of job.
  11. In alternate-day questions, fit as many full cycles as you can and then finish the leftover work day by day in the right order.
  12. Wages are shared in the ratio of the work done, which is rate multiplied by the days worked.
  13. A pipe that fills is a worker, and a leak or drain is a worker who undoes the job, so give it negative units.
  14. A tank that fills in a hours but takes t hours with a leak means the leak alone would empty it in at/(t - a) hours.
  15. Always check that working together is faster than the fastest single worker, and that the answer is in the unit asked.

Memory aids

LUCK
  • L -> take the LCM of the times as the total work
  • U -> turn each time into Units per day
  • C -> Combine the units of everyone working
  • K -> Keep dividing: total units ÷ combined units = time
MDH over W
  • M -> men
  • D -> days
  • H -> hours per day
  • W -> work

Numbers to remember

NumberWhat it is
7.2Days for workers taking 12 and 18 days together
ab/(a + b)Time for two workers together
100/(100 + x)Time factor when efficiency rises by x%
5/8Time factor for 60% more efficiency
at/(t - a)Time for a leak alone to empty a tank
ab/(b - a)Fill time with an inlet (a) and an outlet (b)
2xyz/(xy + yz + zx)Time for three workers from their pair times
3Approximate questions per shift during the 2023 spike

Key formulas and rules

Work = Rate × Time; Rate = 1/Time for one full job
This is the foundation of the chapter.
Total work = LCM of individual times; rate = LCM ÷ time
This is the default method, counted in units per day.
Two together = ab/(a + b)
A takes a days and B takes b days.
Three together = abc/(ab + bc + ca)
Use it for three workers.
B alone = aT/(a - T)
A alone takes a days and both together take T days.
A + B + C together = 2xyz/(xy + yz + zx)
The pair times are x (A + B), y (B + C) and z (C + A).
A alone = 2xyz/(xy + yz - zx)
With x = A + B, y = B + C and z = C + A times; in units, A's rate = half the sum of the pair rates minus the (B + C) rate.
C alone = 1 ÷ (1/T - 1/a - 1/b)
A and B alone take a and b, and all three together take T.

Common traps

Watch out
  • Adding times instead of rates is wrong: 12 days and 18 days do not make 30 days together.
  • When a worker leaves, remember that his working days were also days on which the other worker was working.
  • Reading 60% more efficient as 60% less time (16 × 0.4) is wrong; the correct time is 16 × 100/160.

Solved previous-year questions

Q. Richa, Rita and Reena can independently complete a work in 8, 12 and 24 hours. Working together, how long will they take? (CGL 2023)

Answer: 4 hours

Step 1: Take the total work as 24 units. Step 2: Their rates are 3, 2 and 1 units per hour, which is 6 per hour together. Step 3: Time = 24 ÷ 6 = 4 hours.

Q. P and Q can complete a project in 15 and 10 days. They work together, but after 2 days Q leaves and P finishes. In how many days was the whole work completed? (CGL 2022)

Answer: 12 days

Step 1: Take the total as 30 units, so P does 2 and Q does 3 units per day. Step 2: In 2 days together they do 10 units. Step 3: P finishes the remaining 20 units in 10 days. Step 4: The total time is 2 + 10 = 12 days.

Q. A works 3.5 times as fast as B and takes 45 days less than B to complete a job. Find the days taken by A and B together. (CGL 2023)

Answer: 14 days

Step 1: If A takes a days, B takes 3.5a days. Step 2: 3.5a - a = 2.5a = 45, so a = 18 and B takes 63 days. Step 3: Together = 18 × 63 ÷ 81 = 14 days.

What the full notes cover

The complete Time & Work notes in the app have 15 chapters:

  • From the basics
  • Basic relations: rate, time and work
  • The total-work (LCM) method: your default tool
  • Working together, and finding one person's time
  • Efficiency comparisons
  • Someone leaves, joins or is replaced midway
  • Men, women and boys: one currency
  • The chain rule: man-days and man-hours
  • Alternate-day and periodic work (cycle method)
  • Work and wages
  • Pipes and cisterns
  • Work as a percentage or fraction
  • Solved past questions
  • How SSC asks it
  • At Tier 2 level

Shifts that asked it most